Contact one of our advisors now Call 0800 088 6004

CIL Payable On Retrospective Planning Permission (Planning Inspectorate)

The alleged breach was the failure to submit a commencement notice (CN).

In this case, the development was granted planning permission retrospectively as it was not built in accordance with the original planning permission. At the time of the original planning permission there was no Community Infrastructure Levy (CIL) schedule in place, therefore the appellant was not required to submit a CN.

However, CIL was in force by the time of the retrospective planning permission. Where planning permission has been granted after commencement, the development may be deemed to be liable when permission is granted. Therefore, the appellant was required to submit a CN before starting works on the chargeable development in accordance with regulation 67(1) of the CIL Regulations 2010. As this did not happen the charging authority was entitled to issue a demand notice.

The inspector stated that this was an unfortunate situation for the appellant, but by not completing the works in accordance with the original permission, it was effectively one of their own making.

Source https://www.gov.uk/guidance/appeal-a-community-infrastructure-levy-enforcement-notice#recent-decisions

 

More on Planning Inspectorate from Wilson Browne Solicitors

How Long Can A Planning Inspectorate Appeal Take?

Proposed Flats Too Small To Be Dwellings (Planning Inspectorate)

Vehicle Movements Caused By Hairdresser Working At Home Unacceptable (Planning Inspectorate)

Conversion Of Attached Domestic Garage To Small Commercial Bakery Was Not A Material Change Of Use (Planning Inspectorate)

Cricket Practice Cage In Rear Garden Of Dwelling Was A Building (Planning Inspectorate)

Installation of Entrance Gates Across Cul-de-Sac Would Undermine Social Cohesiveness Of The Community (Planning Inspectorate)

Community Infrastructure Levy: “ASAP” Not valid Commencement Date (Planning Inspectorate)

Tom Warrender

Posted:

Tom Warrender

Partner

Tom is a Partner and Commercial Property Solicitor with a wealth of experience acting for clients both locally and nationally since 2005.